Foreword vii
CommitteePersonnel ix
Introduction xii
SummaryofChanges xiv
GeneralProvisionsandDefinitions
801. General 1
802. ScopeandIntent 1
803. PipingSystemsDefinitions 2
804. PipingSystemsComponentDefinitions 4
805. Design,Fabrication,Operation,andTestingTerms 6
807QualityAssurance 7
Chapter I Materials and Equipment
810. Material and Equipment 8
811. Qualification of Materials and Equipment 8
812. Materials for Use in Cold Climates 9
813. Marking 9
814. Material Specifications 9
815. Equipment Specifications 9
816. Transportation of Line Pipe 10
817. Conditions for the Reuse of Pipe 10
Chapter II Welding
820. Welding 12
821. General 12
822. Preparation for Welding 12
823. Qualification of Procedures and Welders 12
824.Preheating 13
825. Stress Relieving 13
826. Inspection of Welds 14
827. Repair or Removal of Defective Welds in Piping Intended to Operate at
Hoop Stress Levels of 20% or More of the Specified Minimum Yield Strength 15